亚洲成a人片77777群色,熟妇的味道HD中文字幕,久久国产vs

Shandong Water Conservancy Construction Group Co.,Ltd
Chinese
English
Contact Us  
Tel:+86 0537-2270579
Fax:+86 0537-2270579
E-mail:[email protected]
News
 

Barisal Section of Bangladesh Channel Dredging Project Completed Successfully

                                                                                             2018-12-06


On the night of December 2, local time, with the sound of machinery stopped by No. 2 dredger, the Barisal section of the Bangladesh waterway dredging project, which was constructed by the Water Construction Group, has been completed.


Although the phased construction task is not large, the construction difficulties are unprecedented. There are some problems, such as short construction period, tidal change, hard excavation soil and so on.The project department formulates strict construction plan and ensures smooth construction. One is that the front line does not stop working overtime. In order to catch up with the construction period, the working hours of the two vessels are more than 23 hours a day. Second, we should rationally divide our work and expand our advantages. In order to fully mobilize the subjective initiative of the crew and the working performance of dredging vessel, the crew relies on operation technology and working experience, and the dredging vessel allocates construction tasks reasonably. First, the dredging vessel No. 1600 carries out the first excavation, and then the dredging vessel No. 2 guarantees the effective excavation depth. Give full play to the respective advantages of personnel and machines, improve construction efficiency and ensure construction progress. Third, the rear coordination and support is strong. The project department maintains good and effective communication with local owners and supervisors in Bangladesh, establishes mutually trusted working relationships, solves problems in construction in time, reduces construction costs and shortens construction time.


"Time is tight and tasks are heavy, but we have no fear" project personnel unified ideas and objectives, with "dare to fight, fight for the first", high standards, strict requirements, a comprehensive rush to rush construction period, to ensure that a satisfactory answer to the group company.







Link

Copyright  Shandong Water Conservancy Construction Group Co.,Ltd
Add:No. Ten East Road, 33399 Shuifa tower, Ji'nan (The intersection of ten East Road and Tang Ye Xi Road)    Tel:+86 0531 80876106    E-mail:[email protected]
  • <menuitem id="jkwct"><b id="jkwct"><tr id="jkwct"></tr></b></menuitem>
  • 主站蜘蛛池模板: 吉木乃县| 元阳县| 新和县| 淅川县| 明星| 吉安市| 长丰县| 伊吾县| 新龙县| 保德县| 滦平县| 武冈市| 浮山县| 安新县| 元朗区| 康保县| 浪卡子县| 宣威市| 时尚| 闽清县| 曲松县| 清丰县| 孟州市| 七台河市| 黄大仙区| 五寨县| 拉萨市| 琼结县| 黎川县| 垣曲县| 垦利县| 晴隆县| 腾冲县| 阿图什市| 纳雍县| 尼木县| 凉城县| 义乌市| 惠水县| 灵寿县| 腾冲县|