亚洲成a人片77777群色,熟妇的味道HD中文字幕,久久国产vs

Shandong Water Conservancy Construction Group Co.,Ltd
Chinese
English
Contact Us  
Tel:+86 0537-2270579
Fax:+86 0537-2270579
E-mail:[email protected]
News
 

Accelerating progress mobilization meeting in the flood season held By SDWP international company at DESWSP project in Bangladesh

                                                                                             2019-07-19


On July 8, the Bangladesh DESWSP project of SDWP international company held an accelerating progress mobilization meeting in the flood season. The meeting centered on the analysis and summary of the problems existing in the construction process at the present stage, proposition of solutions, clarification of the importance,management ideas and the emergency work task in flood season to guaranteed the construction progress.

The meeting analyzed and summarized the construction of the project cofferdam, the filling of the construction area and the management of the local labor, and put forward the following requirements for the next stage of the project management: Firstly, it is necessary to strengthen the labor management system, strictly manage the temporary local labor during the emergency period, strengthen communication and coordination among various departments and teams, feedback and communicate problems in time, and solve them in a timely manner. Secondly, it is necessary to improve the importance of safety management in the construction, especially for the site construction personnel who must wear safety hats, safety shoes and other labor protection appliances, for putting up a conspicuous warning sign at the location of the hidden danger; thirdly, each construction group is required not to stop work during the rainy season, overtime to ensure the construction progress of the project.

The meeting stressed that under the current political situation in Bangladesh, it is necessary to strengthen the safety and civilized construction and standardized construction of the project, strengthen the safety measures for projects in flood season, strengthen the monitoring of rain and water conditions, make good emergency plans, and ensure the safety of construction personnel.




Link

Copyright  Shandong Water Conservancy Construction Group Co.,Ltd
Add:No. Ten East Road, 33399 Shuifa tower, Ji'nan (The intersection of ten East Road and Tang Ye Xi Road)    Tel:+86 0531 80876106    E-mail:[email protected]
  • <menuitem id="jkwct"><b id="jkwct"><tr id="jkwct"></tr></b></menuitem>
  • 主站蜘蛛池模板: 长白| 丽江市| 子洲县| 墨竹工卡县| 博客| 永安市| 梁河县| 五河县| 科技| 莎车县| 怀宁县| 荥阳市| 商南县| 平乡县| 肃宁县| 阿勒泰市| 玉溪市| 辉南县| 朝阳市| 罗田县| 遵义县| 天门市| 株洲县| 南丰县| 清水河县| 营山县| 连云港市| 吉木乃县| 册亨县| 万宁市| 广东省| 邹平县| 宁波市| 平谷区| 鸡西市| 仁寿县| 阜南县| 衡山县| 寻甸| 渝中区| 横峰县|